3032 Remediation October 3, 2010 Update
Well we are about done with the remediation process. Tomorrow morning we are getting the MBR window stained and that is about it for the actual work on the house. We still have to put the downspouts back on the outside and we are getting an "apron" put on the front of the garage. (This "apron" is a four foot concrete extension from the garage floor out into the driveway. The purpose is to "bridge" the space between the footings and solid ground. This area has settled and is causing the driveway to cave a bit where it meets the garage floor.)
Back of house "Before" remediation.
Following are what will probably be the final pictures of this process. The pics are not in any real chronological order, but that does not keep one from seeing what has transpired.
Example of new "working" louver in front gable. Similar louvers are above the garage and above the great room and four-season porch.